RBF and RBW for Lease in Bac Ninh RBF and RBW for Lease in Bac Ninh

SBN-FW19 Ready-built Factory, Warehouse for Lease in Bac Ninh

Yen Phong, Bac Ninh

  • iconTotal area:50000 m²

  • iconVacant area:6,800 m²

  • icon Price:Contact

Contact an agent

John Campbell

John Campbell

Director – Head of Industrial Services

+84(0) 986 718 337 Contact now
SBN-FW19 Ready-built Factory, Warehouse for Lease in Bac Ninh

Yen Phong, Bac Ninh

  • iconTotal area:50000 m²

  • iconVacant area:6,800 m²

  • iconPrice:Contact

Key features

  • A variety of supporting services and professional staff provide comprehensive support.

  • The property is in Yen Phong, Bac Ninh, a key economic region with excellent transportation links.

  • The buildings have been designed well, which optimises efficiency in all manufacturing and storage processes

  • A skilled and abundant workforce in the surrounding area.

features

Market your property

Whether you’re selling or looking to attract new tenants, we’re here to help

Read more

Summary

The property is in one of the best industrial parks (IP) in Northern Viet Nam.

The buildings have been designed well, which optimises efficiency in all manufacturing and storage processes. The IP provides one-stop services, which include a wide range of supporting activities and professional staff.

The industrial park is positioned close to National Highway 18 and the Ha Noi – Thai Nguyen Expressway, 20 km from Noi Bai Airport, and 34 km from Ha Noi’s CBD. Companies renting facilities here can easily connect with large enterprises such as Samsung and Luxshare.

Accessibility

  • features

    Hanoi CBD

    35 km

  • features

    Noi Bai Airport

    22 km

  • features

    Hai Phong Seaport

    120 km

  • features

    Noi Bai - Ha Long Highway

    01 km

Commercial

  • Established

    2020

  • Lease term

    2055

  • Min leased term

    03 years

  • Unit size

    3,400 – 6,700 sqm

Technical

  • Floor loading

    1.5 tonnes/ m2

  • Ceiling height

    7 - 9 m

  • Power Supply

    Station: 110/22KV – 2x63MVA

  • Water Supply

    22,000 m3/day

  • Waste Treatment

    12,000 m3/day

  • Internal Main Roads

    32 m with 4-6 lanes

  • Internal Branch Roads

    23 m with 2-3 lanes