SBN-F81 Ready-Built Factory for Sale in Bac Ninh SBN-F81 Ready-Built Factory for Sale in Bac Ninh

SBN-F81 Ready-Built Factory for Sale in Bac Ninh

Nenh Ward, Bac Ninh

  • iconTotal area: 9,200 m²

  • iconVacant area:NA

  • icon Price:Contact

Contact an agent

John Campbell

John Campbell

Director – Head of Industrial Services

+84(0) 986 718 337 Contact now
SBN-F81 Ready-Built Factory for Sale in Bac Ninh

Nenh Ward, Bac Ninh

  • iconTotal area: 9,200 m²

  • iconVacant area:NA

  • iconPrice:Contact

Key features

  • Strategic location within Bac Ninh’s fast-growing industrial corridor, surrounded by major global manufacturers such as Foxconn, Luxshare-ICT, Goertek, JA Solar, Shunsin, and Fukang.

  • Strong labour access supported by nearby universities and technical training institutions.

  • Ready infrastructure with completed facilities, enabling rapid setup and reduced initial costs.

  • Target industries include electronics, assembly, consumer goods, and other environmentally friendly manufacturing sectors.

features

Market your property

Whether you’re selling or looking to attract new tenants, we’re here to help

Read more

Summary

Backed by an experienced industrial developer with a substantial land bank and established ecosystem, the project has attracted strong FDI interest and high-tech manufacturers.

Located in Bac Ninh, a key FDI destination, the ready-built factory features modern infrastructure designed to support manufacturing and logistics operations. Its position within a major northern industrial hub, alongside global players such as Foxconn and Goertek, strengthens supply chain integration and access to a skilled workforce.

Accessibility

  • features

    Ha Noi CBD

    47 km / 1 hr

  • features

    Noi Bai Airport

    45 km / 50 mins

  • features

    Hai Phong Port

    125 km / 1 hr 55 mins

  • features

    Lach Huyen Deep Seaport

    135 km / 2 hrs 10 mins

  • features

    Next to the Ha Noi - Bac Ninh Highway (QL1A) to the Viet Nam - China border

Commercial

  • Operation term

    2057

  • Deposit

    Contact Savills

  • Electricity fee

    Subject to provider – EVN

  • Water fee

    US$0.57 / m3

  • Wastewater treatment fee

    US$0.43 / m3

Technical

  • Loading capacity

    1 tons/ m2

  • Ceiling height

    7 m

  • Electricity supply

    110/22kV, 4*63 MVA

  • Water supply

    18,000 m3 / day

  • Wastewater teatment

    9,300 m3 / day

  • Firefighting

    Fire hydrants are positioned along roads and intersections at standard intervals of 120 - 150 m.

  • Telecommunication

    The telecommunication cable system is designed underground.

  • Internal roads

    Main: 29 - 33 m. Branch: 17.5 m. Pavements: 5 m

  • On-site facilities

    Independent stormwater and wastewater systems. Residential project for experts and expatriates.

  • Facilities

    Markets, clinics, schools, community centres, and pharmacies.