SDN_Ready-Built Hybrid Factory for Lease in Dong Nai | Savills Vietnam SDN_Ready-Built Hybrid Factory for Lease in Dong Nai | Savills Vietnam

SDN_Ready-Built Hybrid Factory for Lease in Dong Nai

Nhon Trach, Dong Nai

  • iconTotal area:96,769. Phase 1: 44,147 m2; Phase 2: 52,622 m²

  • iconVacant area:From 4,847 m²

  • icon Price:Contact

Contact an agent

John Campbell

John Campbell

Director – Head of Industrial Services

+84(0) 986 718 337 Contact now
SDN_Ready-Built Hybrid Factory for Lease in Dong Nai

Nhon Trach, Dong Nai

  • iconTotal area:96,769. Phase 1: 44,147 m2; Phase 2: 52,622 m²

  • iconVacant area:From 4,847 m²

  • iconPrice:Contact

Key features

  • Sustainable & LEED-standard design: integrated solar panel systems, promoting energy efficiency and long-term operational sustainability

  • Prime location with direct access to major trade hubs and key ports, ideal for logistics and regional distribution.

  • Modern infrastructure built to international standards, designed for high-performance industrial operations.

  • Tax incentives and a collaborative industrial ecosystem

features

Market your property

Whether you’re selling or looking to attract new tenants, we’re here to help

Read more

Summary

Nhon Trach 6D Industrial Park in Dong Nai offers a strategic and sustainable investment opportunity in one of Vietnam’s top industrial hubs. The property spans 96,769sqm with seamless access to HCMC, key ports, and airports, the park features LEED-registered hybrid factory-office space with solar panels, 10.5m warehouse clear height, and 3 tons/sqm floor load.

Designed for industries like furniture, textiles, plastics, and metal processing, it combines international-standard infrastructure with 24/7 security, professional management, and a strong labor pool. Investors benefit from generous tax incentives, making it a high-potential platform for long-term growth.

Accessibility

  • features

    HCMC CBD

    39 km

  • features

    TSN Airport

    48 km

  • features

    Long Thanh Airport

    18 km

  • features

    Cat Lai Port

    32 km

Commercial

  • Legal Status

    LURC & legal docs on hand

  • Expected Handover Time

    August 2025

Technical

  • Power supply

    100KVA/1,000sqm

  • Water Supply

    120,000 m3/day

  • Waste treatment

    90,000 m3/day

  • Telecommunications

    Fiber, ADSL

  • Others

    Fire fighting system; Parking lot; Solar panels; 24-hour security with CCTV, fence and security booth.