SHD-L111 – Industrial Land for Transfer in Hai Duong | Savills Vietnam SHD-L111 – Industrial Land for Transfer in Hai Duong | Savills Vietnam

SHD-L111 – Industrial Land for Transfer in Hai Duong

Cam Giang, Hai Duong

  • iconTotal area:150 ha

  • iconVacant area:8 ha

  • icon Price:Contact

Contact an agent

John Campbell

John Campbell

Associate Director – Head of Industrial Services

+84(0) 986 718 337 Contact now
SHD-L111 – Industrial Land for Transfer in Hai Duong

Cam Giang, Hai Duong

  • iconTotal area:150 ha

  • iconVacant area:8 ha

  • iconPrice:Contact

Key features

  • Connecting point between Hanoi/Bac Ninh and Hai Phong, close to National Road 5, 5B

  • Synchronised infrastructure, full utilities for stable production.

  • The land plot is ready to handover to investor.

  • The IP receives strong support from the Vietnamese and Singaporean governments, creating the most favorable conditions for FDI projects to implement.

  • An abundant workforce in the surrounding area.

  • Surrounding enterprises include: Seo Kwang Electric, Tran Phu Cable, Best Pacific, BWID, Harting Vietnam…

features

Market your property

Whether you’re selling or looking to attract new tenants, we’re here to help

Read more

Summary

The industrial park is designed to be a modern and clean industrial park, offering a world-class operating environment, reliable infrastructure, and dedicated customer service. It is well-positioned to meet the needs for import and export demands, e-commerce enterprises, and retail businesses.

 

Located in the Northern Key Economic Region in the Red River Delta, the IP is adjacent to National Highway 5 that connects Hanoi – Hung Yen, Hai Duong, and Hai Phong, and in close proximity to Hai Phong Port, and both Noi Bai International Airport and the Cat Bi Hai Phong Airport.

Accessibility

  • features

    Hanoi CBD

    44 km / 70 mins

  • features

    Noi Bai Airport

    65 km / 90 mins

  • features

    Lach Huyen Port

    92 km / 35 mins

  • features

    National Road 5

    1 km / 2 mins

Commercial

  • Lease Term

    2058

  • Status

    Ready for Construction

  • Land Use Fee

    Paid Annually

Technical

  • Power Supply

    Supply Voltage: 63 MVA

  • Water Supply

    Capacity: Minimum 12,000 m3/ day

  • Wastewater Treatement

    Capacity: Minimum 5,000 m3/ day

  • Telecommunications

    High-speed and stable optical-fiber internet

  • Internal Roads

    Synchronous internal road with 56m wide main roads and 26m wide branch roads