SPT-FW78 Industrial Land and Ready‑Built or Built‑to‑Suit Factory and Warehouse Space in Phu Tho SPT-FW78 Industrial Land and Ready‑Built or Built‑to‑Suit Factory and Warehouse Space in Phu Tho

SPT-FW78 Industrial Land and Ready‑Built or Built‑to‑Suit Factory and Warehouse Space in Phu Tho

Phuc Yen, Phu Tho

  • iconTotal area:1,113,000 sq m m²

  • iconVacant area:822,000 sq m m²

  • icon Price:Contact

Contact an agent

John Campbell

John Campbell

Director – Head of Industrial Services

+84(0) 986 718 337 Contact now
SPT-FW78 Industrial Land and Ready‑Built or Built‑to‑Suit Factory and Warehouse Space in Phu Tho

Phuc Yen, Phu Tho

  • iconTotal area:1,113,000 sq m m²

  • iconVacant area:822,000 sq m m²

  • iconPrice:Contact

Key features

  • Strategic location in Phuc Yen Ward, Vinh Phuc Province, bordering Ha Noi with convenient access to major transport routes and logistics hubs.

  • Comprehensive industrial real estate offering, including industrial land, ready-built factories and warehouses, and build-to-suit facilities across multiple plot sizes.

  • Smart industrial park model, featuring digitalised management systems that support online communication and administrative tracking between tenants and park management.

  • One‑stop investment support, covering investment procedures, company setup, factory development consulting and workforce assistance.

features

Market your property

Whether you’re selling or looking to attract new tenants, we’re here to help

Read more

Summary

Located in Vinh Phuc Province along the Kunming – Ha Noi – Hai Phong economic corridor, the project is positioned as a key link in Northern Viet Nam’s industrial ecosystem, with strong connectivity to international air routes, expressways and major trade corridors.

Planned as a modern industrial park, it supports a diverse manufacturing base including electronics, high-tech, mechanical engineering and automotive industries. It benefits from a surrounding ecosystem of multinational manufacturers such as Samsung, Canon, Honda, Toyota and LG.

With well-planned infrastructure, modern facilities, and integrated support services, the park provides a stable and flexible investment environment for manufacturing enterprises.

Accessibility

  • features

    Ha Noi CBD

    40 km / 1 hour 5 mins

  • features

    Noi Bai Airport

    10 km / 10 mins

  • features

    Dinh Vu Port

    150 km / 2 hours 20 mins

  • features

    Lach Huyen Port

    160 km / 2 hour 40 mins

  • features

    Adjacent to Noi Bai - Lao Cai Highway and Nguyen Tat Thanh Street

  • features

    Lao Cai - Ha Noi - Hai Phong Railway

    1 km / 3 mins

Commercial

  • Handover

    Ready

  • Lease term

    2074

Technical

  • Unit Size

    Warehouse: 12,000 - 20,000 sq m. Factory: 8,000 - 18,000 sq m.

  • Loading capacity

    Warehouse: 2 tons / sq m. Factory: 2 tons / sq m.

  • Electricity supply

    110kV / 22kV, 9*63 MVA

  • Water supply

    22,000 m3 / day

  • Wastewater treatment

    12,000 m3 / day

  • Safety

    Standard-compliant fire protection system. Fire hydrants installed along internal roads at intervals of 120 - 150 m.

  • Telecommunications

    Systems ready for connection based on tenant requirements. 4,000-line satellite exchange system.

  • Internal road system

    Main roads: 80 m. Sub roads: 25 m - 40 m. Dedicated parking areas within each subdivision.

  • On-site facilities

    Independent rainwater drainage system. Intermediate retention ponds for flood prevention. Worker dormitory, canteen, kitchen, meeting room and office.