Industrial land for lease in Ha Noi | Savills Vietnam Industrial land for lease in Ha Noi | Savills Vietnam

SHN- L01 Industrial land for lease in Hanoi

Phu Xuyen, Ha Noi

  • iconTotal area:90.4 ha

  • iconVacant area:60 ha

  • icon Price:$140 /m²

Contact an agent

John Campbell

John Campbell

Associate Director – Head of Industrial Services

+84(0) 986 718 337 Contact now
SHN- L01 Industrial land for lease in Hanoi

Phu Xuyen, Ha Noi

  • iconTotal area:90.4 ha

  • iconVacant area:60 ha

  • iconPrice:$140 /m²

Key features

  • Power Supply

  • Water Supply

  • Waste Treatment

  • Telecommunications

  • Internal Roads

  • Dormitories

features

Market your property

Whether you’re selling or looking to attract new tenants, we’re here to help

Read more

Summary

An industrial-urban complex conveniently located at the southern gate of Hanoi, the starting point of Phu Xuyen satellite city that is oriented for development by Vietnamese government as a hub for logistics, high tech and supporting industries across machinery and equipment, electronics, and automotive.

Located on the highway Phap Van – Cau Gie – Ninh Binh (New Highway 1A) and the old National Highway 1A, is the gateway to the south of Hanoi capital, where there is a highway connecting Ho Chi Minh Road with National Highway 5B to Hai Phong. All vehicles going from North – South must go by the industrial zone.

Accessibility

  • features

    Hanoi CBD

    40 Km

  • features

    Noi Bai Airport

    40 Km

  • features

    Hai Phong Port

    120 Km

  • features

    Highway

    0.5 Km

Commercial

  • Lease price:

    US$140/m2

  • Deposit:

    20% of total lease

  • Management fee:

    $0.8/m2

  • Water supply fee:

    $0.4/m3/month

  • Waste-water fee:

    $0.2/m3/month

  • Electricity fee:

    According to EVN price adjustment

Technical

  • Water supply capacity:

    Initial capacity from 3,500m3/ day, and upgradable to 25,000m3/ day.

  • Wastewater treatment capacity:

    Wastewater treatment plant with capacity of 3,000 m3/day, using nanotechnology- based treatment system.

  • Electricity capacity:

    The site is powered with 35KV line. Transmission line is installed underground or along the road to the factory connection point.